Master Bathroom Remodel in Topeka, KS
From a Leaky 70s Bath to Black & White Style
PROJECT COST
$80,000
TIMELINE
12 Weeks
LOCATION
Topeka, KS
A Dated Upstairs Bathroom Gets Rebuilt
The homeowners’ upstairs bathroom looked like it belonged in the 70s, and the old shower had leaked into the ceiling space. They wanted the job done right the first time. The whole room came down to the studs and was rebuilt.
“My bathroom remodel project was a complete overhaul. I had Cory and his team bring the entire bathroom down to the studs. They placed new subflooring, rerouted existing plumbing, completely reworked the electrical to my desired specifications. I had made renderings of what I was hoping to transform my bathroom into, and Cory and his team made it into a reality. I was completely satisfied with the initial talks, the process, and the finished product.”
—The Homeowners, Topeka, KS
Problems the Homeowners Wanted Fixed
- The old shower had leaked into the ceiling space.
- The whole bathroom was dated, with a look straight out of the 70s.
- The cast-iron plumbing stack ran from this bathroom to the basement.
- A low soffit and a large gap of wasted space sat next to the shower.
How We Rebuilt It Down to the Studs
We took the bathroom down to the studs and joists. The new floor plan added a tub and reconfigured the shower area, and new subflooring went in with reworked plumbing and electrical. The shower and tub side is all black and the vanity side is all white. We partnered with Fine Design Interiors on finishes, paint colors, and trim.
Standout Features of the Remodel
Custom Shower Niches With Dimmable Lighting
The custom shower niches are finished in tile and include dimmable lighting, set into the black marble-look wall of the shower.
Kohler Rain Head and Hand Shower
The black shower wall holds a Kohler rain head and a hand shower, with two body sprays set lower on the same wall.
More Features of the Project
- Tile imported from Italy
- Added tub with wall-mounted Kohler faucets
- Frosted shower door on the black shower side
- Custom white vanity cabinetry
- Kohler Anthem digital shower controller
Questions About This Master Bathroom Remodel
The stack needed to be replaced, not patched. In this Topeka remodel, it ran from the upstairs bathroom down to the basement and through the main level.
Yes. On this project, everything changed on the plan, which added a tub and reconfigured the shower area. The old layout had a large gap of wasted space next to the shower and a soffit that dropped low.
Here, the answer was a full tear-out of the bathroom. The homeowners wanted it done right the first time, so the shower, plumbing and electrical were all redone along with the floor.
Yes. The niches in this shower are custom-built with dimmable lighting. We worked with Fine Design Interiors to choose the niche tile along with the rest of the finishes.